Case Study

FREE-RANGE EGG PRODUCTION FACILITY, WALES
SERVICES OVERVIEW


Client: Undisclosed | Sector: Agriculture | Value: circa £400,000.00

Belasco Associates were engaged by a solicitor working on behalf of the owner of a free-range egg production facility, to provide an Expert Report relating to the feasibility and cost analysis of the replacement of perimeter walls following alleged defective construction. Our scope included:

  • An initial site visit to inspect the facility and the alleged defective works
  • A full appraisal of various construction methods
  • Liaison with a specialist contractor to consider the requirement for temporary support of the facilities’ superstructure and
  • A full cost appraisal of multiple construction methods

Our Expert Report was compliant with Part 35 of the Civil Procedural Rules (CPR) and was prepared in contemplation of litigation.

GET IN TOUCH TO DISCUSS YOUR REQUIREMENTS.
Fill out the form below to request a call back:

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    Loading...